ABC Project Database Submission Form
Load from History
Select a previous upload...
Shaler Street_openai-gpt-5.6-luna_Oct-06-2026_10-41.json
Jacoby Creek Bridge (Left)_openai-gpt-5.6-luna_Oct-06-2026_10-36.json
Glenbridge Avenue Bridge_openai-gpt-5.6-luna_Oct-06-2026_10-33.json
DE ROCHE CREEK STRS. & APPRS. (S)_openai-gpt-5.6-luna_Oct-06-2026_10-29.json
CLARK FORK - 1M NW TROUT CREEK_openai-gpt-5.6-luna_Oct-06-2026_10-22.json
CR 661 (BLACKHALL ROAD) OVER RUM CREEK_openai-gpt-5.6-luna_Oct-06-2026_10-17.json
Blackhall Road over Rum Creek Bridge_openai-gpt-5.6-luna_Oct-05-2026_14-11.json
Clark Fork River Bridge_openai-gpt-5.6-luna_Oct-05-2026_14-08.json
I-30 over De Roche Creek Bridge_openai-gpt-5.6-luna_Oct-05-2026_14-06.json
Glenbridge Avenue over US Route 6 Bridge_openai-gpt-5.6-luna_Oct-05-2026_14-04.json
Jacoby Creek Bridge (Left) (Replace)_openai-gpt-5.6-luna_Oct-05-2026_14-01.json
Shaler Street Bridge_openai-gpt-5.6-luna_Oct-05-2026_13-58.json
Blackhall Road Bridge Project Modular Decked Beams Made with Bulb Tee Girders_openai-gpt-5.6-luna_Sep-17-2026_11-42.json
Clark Fork-1M NW Trout Creek_openai-gpt-5.6-luna_Sep-17-2026_11-34.json
De Roche Creek STRS. & APPRS. (S)_openai-gpt-5.6-luna_Sep-17-2026_11-28.json
Glenbridge Avenue Bridge Replacement_openai-gpt-5.6-luna_Sep-17-2026_11-22.json
Jacoby Creek Bridge Replacement Jack & Slide (101 SB, Left Bridge)_openai-gpt-5.6-luna_Sep-17-2026_10-52.json
Shaler Street Bridge_openai-gpt-5.6-luna_Sep-14-2026_10-35.json
US 85 State Highway 470 (C470) SB to EB Flyover Ramp (Santa FeC470 Flyover)_openai-gpt-5-mini_Jul-27-2026_14-42.json
Santa FeC470 Flyover_google-gemini-2.5-flash_Jul-27-2026_14-38.json
Lake Pontchartrain Causeway Bridge & Safety Bay Construction, Past & Present_google-gemini-2.5-flash_Jul-06-2026_11-44.json
Iowa 1 over Camp Creek Bridge Replacement_deepseek-deepseek-v4-flash_Jul-06-2026_04-52.json
Bronco Bridge over Platte River Replacement Project_deepseek-deepseek-v4-flash_Jul-06-2026_04-33.json
Atlantic Street Bridge Project_Jul-06-2026_00-46.json
Third-Party API
Hipergator (Local)
Offline
Select LLM (via OpenRouter)
anthropic/claude-3.5-haiku
meta-llama/llama-3.3-70b-instruct
meta-llama/llama-3.3-70b-instruct:free
google/gemini-2.5-flash
google/gemini-2.5-pro
google/gemini-3.1-flash-lite-preview
openai/gpt-4o-mini
openai/gpt-5-mini
openai/gpt-5.6-luna
x-ai/grok-4.1-fast
OpenRouter API Key
Use default key
Use my API key
Add from Web Page URL (fetchs linked PDFs, embedded videos & page text)
Fetch Data
Staged Files
Loading...
Run
Select LLM
Llama 3.3
Upload Source Material
Add YouTube Link
Add Link
Staged Files
Loading...
Run Pipeline
Terminal
1
Owner's Information
First Name
Last Name
Credentials
Position
Affiliation
Email
Phone
2
Project Information
Project Name
Project Owner
Year ABC Completed
County
State
State ID #
NBI #
Location Description
Latitude
Longitude
3
ABC Project Details
Brief Project Summary (ABC used)
Location
Select...
Rural
Urban
Spans (#)
Beam Material
Max. Span Length (ft)
Total Bridge Length (ft)
ABC Construction Equipment Category
Dimensions
Describe ABC construction equipment types used
Traffic Impact Category
Mobility Impact Time
ABC - Time using ABC
Conventional - Time if conventional
4
Primary Drivers
Select all that apply
Reduced traffic impacts
Reduced onsite construction time
Improved work-zone safety
Improved site constructability
Improved material quality and product durability
Minimized environmental impacts
Reduced initial cost
Reduced life-cycle cost
Single construction season
Contractor-initiated change
Maintain existing alignment
Limit right-of-way take
Ability to utilize local contractor or county workforce
Emergency replacement
Minimize business impacts
Maintain essential services
Additional Primary Drivers
5
Traffic Data
Average Daily Traffic
Traffic Management Alternative if Constructed Conventionally
6
Project Descriptions
Existing Bridge Description
Replacement or New Bridge
Construction Method
Stakeholder Feedback
High Performance Material
7
Project Planning
Decision-Making Tools
FHWA Process
State Process
Benefit/Cost Method
TPF-5(221) [AHP Decision-Making Tool]
Other Decision-Making Tool
Site Procurement
Programmatic Agreement
Right-of-Way Acquisition
Relocation Incentive
Flexibility in Utilities
Early Environmental Clearance & Permitting
Electronic Shop Drawing Submittal & Approval Process
Fabrication Drawings Prior to Bid
Material Procurement Prior to Contract Award
Other Site Procurement
8
Project Delivery & Contracting
Project Delivery
Design-Bid-Build
Design-Build
In-House Force
CM/GC
Public-Private Partnership
Emergency Contract
Alternative Technical Concept
Alternative Ton (Foundation)
Other Project Delivery
Contracting
A+B Bidding
A+B+C Bidding
Full Lane Closure
Warranty
Lane Rental
Incentive / Disincentive Clause
No Excuse Bonus
Lump Sum Bonus
Contractor Option
Contractor Revision
Value Engineering
VE with Partnering
Formalized Partnering
Best Value Award
Performance Contracting
Accelerated Bid Process
Other Contracting
9
Geotechnical Solutions
Foundations and Walls
Continuous Flight Auger Pile
Micropile
High-Capacity Pile
GRS-IBS
CIP Substructure Under Traffic
Reused Substructure/Foundation Unit
Pre-Grouted Void
Other Foundation/Wall
Rapid Embankment
EPS Geofoam (Expanded Polystyrene Geofoam)
Self-Compacting Backfill
Intelligent Compaction
Fully-Contained Flooded Backfill
Embankment Surcharge
Lightweight Fill
Other Rapid Embankment
10
Structural Solutions
Deck Elements
Full-Depth Precast Deck Panel w/PT
Full-Depth Precast Deck Panel w/o PT
Partial-Depth Precast Deck Panel
FRP Deck Panel
Steel Grid (open) Deck
Steel Grid (concrete filled) Deck
Aluminum Deck
Exodermic Deck
Orthotropic Deck
UHPC Waffle Deck
Other Deck Element
Deck Beam Elements
Adjacent Deck Bulb T Beam
Adjacent T Beam
Adjacent Inverted T Beam
Adjacent Box Beam
Adjacent Slab Beam
Adjacent Slab Beam w/Backwall
MDcBc (Modular concrete-Decked concrete Beam)
MDcBs (Modular concrete-Decked steel Beam)
MDcBh (Modular concrete-Decked hybrid Beam)
MDhBs (Modular hybrid-Decked steel Beam)
PT Concrete Through-Girder
Other Deck Beam Element
Full-Width Beam Elements
Truss Span w/o Deck
Arch Span w/o Deck
Precast Segmental
Steel Segmental
Other Full-Width Beam Element
Pier Elements
Precast Pile Cap
Precast Cap Shell
Precast Cap & Column(s)
Precast Column Cap (Precast Bent Cap; Precast Crossbeam)
Precast Column(s)
Precast Footing Shell
Precast Footing(s)
Precast Caisson Cap
Steel Pile Cap
Steel Column Cap
Steel Column(s)
Steel Cap & Column(s)
Other Pier Element
Abutment and Wall Elements
Precast Abutment Cap
Precast Backwall
Precast Abutment Cap w/Backwall
Precast Abutment Stem
Precast Wingwall
Precast Cheek Wall
Precast Abutment Footing
Steel Sheet Piling
Precast Sheet Piling
Precast Lagging Panel
Precast Full-Height Wall Panel
Precast Retaining Wall
MSE Wall
Modular Block Wall
GRS Abutment
Proprietary Wall
Other Abutment and Wall Element
11
Buried Bridge Elements & Prefabricated Systems
Buried Bridge Elements
Buried Precast Arch
Buried Precast 3-Sided
Buried Precast Box
Buried Metal Arch
Buried Metal 3-Sided
Buried Metal Box
Other Buried Bridge Element
Superstructure Systems
FDcBc (Full-Width concrete-Decked concrete Beam Unit)
FDcBs (Full-Width concrete-Decked steel Beam Unit)
Through-Girder Span w/Deck
Truss Span w/Deck
Arch Span w/Deck
Steel Orthotropic Box Girder
Prestressed Multi-Cell Box Girder Span
Metal Panel Deck Span
RDcBc (Reused concrete-Decked concrete Beam span)
RDcBs (Reused concrete-Decked steel Beam span)
Other Superstructure System
Superstructure / Substructure Systems
Super/Substructure System w/o Foundations
Buried Bridge System w/o Foundations
Other Superstructure / Substructure System
Total Bridge Systems
Super/Substructure System w/ Shallow Foundations
Rolled/Launched/Slid/Lifted
Other Total Bridge System
12
Miscellaneous
Miscellaneous Prefabricated Elements
Precast Approach Slab
Precast Curb
Prefabricated Railing
Precast Diaphragm
Steel Diaphragm
LWC Beam (lightweight concrete beam)
LWC Deck (lightweight concrete deck)
LWC Substructure (lightweight concrete substructure)
Other Miscellaneous Prefabricated Element
Closure Joints / Connections
CIP Reinforced Closure Joint
High-Strength CIP Reinforced Closure Joint
HEST-LSH Concrete Joint
UHPC Closure Joint
Epoxy Joint
Grouted Key Closure Joint
Grouted Blockout w/Shear Connector
Grouted Duct Connection
Pocket Connection
Socket Connection
Link Slab
Match Cast Closure Joint
Bars in Splice Coupler
PT Ducts/Bonded
PT Ducts/Un-bonded
Other Closure Joint/Connection
Overlays
Standard Concrete Overlay
High-Density Concrete Overlay
HPC Overlay
UHPC Overlay
Asphalt Overlay w/Membrane
Asphalt Overlay w/o Membrane
Latex-Modified Overlay
Micro-Silica Concrete Overlay
Polymer Concrete Overlay
Rapid Set Overlay
Thin-Bonded Epoxy Overlay
Asphalt Chip Seal w/o Membrane
Other Overlay
13
ABC Construction Equipment/Methods
SPMT (Self-Propelled Modular Transporter)
SPMTs
SPMT with Gantry System
SPMT on Barge
Other SPMT Combination
Lateral Slide & Longitudinal Launch
Lateral Slide (w/ roller or pad)
Longitudinal Launch
Miscellaneous ABC Equipment
High-Capacity Crane(s)
High-Capacity Crane on Barge
Strand Jack
Towed Modular Transporter
Float In
Gantry System
Multi-Axle Flatbed Trailer
Other ABC Equipment
14
Costs & Funding
Costs
Funding Source
Incentive Program
15
Additional Contacts & Documents
Additional Contacts
16
Final Details
Photo Credits
Other Related Information
Other Related URLs
Save Verified Data
View Document:
Select a document...